Boessenkool

1956 New factory hall
Turfkade

  back to the timeline

In the photo, the steel construction preparations are in full swing.

The Dagblad van het Oosten wrote at the time: ‘With the move to the new, very modern and artistically designed 700m2 company building, Almelo has gained a fantastic machine factory’. And so it was. The first stone was laid on 23 May 1956 and the festive opening ceremony was performed by the daughter of director Nico Boessenkool by placing a memorial stone. During the major renovation in 2023, it turned out that there was something more behind it…

  back to the timeline